Industrial Sites

Industrial Sites

Looking for the right Industrial Park? You have come to the right place – every County in Northeastern Nevada boasts its own industrial park with a multitude of services to meet your company’s need. Do you require a rail spur with access to the Interstate? We have you covered. Do you require a large parcel of land with direct access to air service – we can offer that as well. Regardless of what you need, there is a pretty good chance that one of our communities has exactly what you’re looking for. And no matter which one you choose, take comfort in knowing that you are within a single day’s drive of millions of customers in California, Idaho’s Treasure & Magic Valleys, Utah’s Wasatch Front, and the Las Vegas & Phoenix metropolitan areas.

West Wendover Industrial Park

  • ¼ mile from Interstate-80 Exit 410
  • Adjacent to U.S. Highway 93 (Alternate)
  • ½ mile from Wendover Airport
  • Adjacent to Union Pacific Railroad mainline
  • Developed Portion: Full
  • Undeveloped Portion: 10 acre parcels up to 2,244 acres available (Adjacent to developed portion)
  • Future Development: City of West Wendover currently negotiating the transfer of 6,000 acres from USAF and BLM that will have direct access to Wendover Airport (Adjacent to developed and undeveloped portion of industrial park)
  • Developed Portion
  • Undeveloped Portion
    • Utilities adjacent to site
  • Industrial Park partially owned by City of West Wendover – Local incentives available to qualified companies based on economic impact.
  • Local contractor available to construct build-to-suit facility with either a purchase or lease option.
  • Existing Tenants
    • FEDEX
    • Tow
    • Deep Roots Dispensary
    • Harvest of Nevada

White Pine County Industrial Park

  • Yards from US-93
  • Within 1 mile from Yelland Field
  • 4 miles from Ely, Nevada
  • Within 1 mile of future Northern Nevada Railway (Ruth-Shafter line) Estimated completion date: Fall 2019
  • 2-20+ acre parcels
  • 2 properties with buildings available for lease or purchase
  • Power
  • Water
  • Sewer
  • Fire Protection
  • Paved Streets
  • Curbing
  • Industrial Park partially owned by White Pine County – Local incentives available to qualified companies based on economic impact.
  • Existing Tenants
    • Suburban Propane
    • Reck Brothers Construction
    • R & R Roofing

City of Wells Industrial Park

  • 5-20+ acre parcels
  • 10,000 sq. ft. hanger available
  • Power: Wells Rural Electric Cooperative (3-PH to all parcels) – very competitive prices
  • Water
  • Sewer
  • Fire Protection
  • High Speed Broadband
  • Industrial Park wholly owned by City of Wells – Local incentives available to qualified companies based on economic impact.

City of Carlin Industrial Park & Lands

  • ¼ mile from Interstate-80
  • Approximately 1 mile to Union Pacific Railway
  • Adjacent to Nevada State Highway-766 (Gateway to Barrick and Newmont Mines along the World Famous Carlin Trend)
  • Developed Park
    • 5-187 acre parcels
  • Undeveloped Land
    • 15-75 acre parcels
  • Developed Park
    • Power: Wells Rural Electric Cooperative – very competitive rates
    • Water
    • Sewer
    • Fire Protection
    • Natural Gas: Southwest Gas
  • Industrial Park wholly owned by City of Carlin – Local incentives available to qualified companies based on economic impact.
  • Existing Tenants
    • RedCore Drilling
    • Ahern
    • Pilot Thomas Transportation

California Trail Industrial Rail Park

  • Within 1 mile of Interstate-80
  • Adjacent to NV-305
  • Adjacent to I-80
  • Less than 1 mile to exit 229
  • Adjacent to Union Pacific Mainline
  • Approximately 560 acres available for development.
  • Water & Sewer adjacent
  • Natural Gas within ¼ mile
  • Cost sharing programs available
  • Preliminary designs and developmental concept complete and approved by Union Pacific for rail siding, spur, and yard.

All maps are for graphical purposes only. They do not represent a legal survey. Video music supplied by purple-planet.com.

Infographic
US Regional Map